
Cammeray Square
CAMMERAY · 2020–2026Cladding replacement on Buildings B and D (fire order), facade works, a staged repaint of Building A, balcony and terrace upgrades and leak repairs.
Read the case study
Height safety system, Raptor rail, window cleaning every 4 months, and concrete and facade repairs.
View gallery · 17 PHOTOSA beachfront building in salt air that needs constant care, and a facade that has to be safe and easy to reach for every trade.
We installed and maintain the height safety system, including a Raptor facade access rail in 2018, so every visit starts from a certified, fast set-up.
More than 10 years as the building’s maintenance partner: cleaning every 4 months and repairs as needed.
One Vision Project Services have been associated with our 8 storey building for over 10 years … In 2018 One Vision installed the Raptor Façade Access Rail System. The Façade Access Rail System enabled One Vision’s abseilers to safely slide along the rail(s) rather than relocating and dropping ropes every 2 – 3 metres. Since installation, the abseilers have gained easier and faster access to the building façade for ongoing maintenance, repairs and painting.

Cladding replacement on Buildings B and D (fire order), facade works, a staged repaint of Building A, balcony and terrace upgrades and leak repairs.
Read the case study
Decorative sandstone tiles removed, emergency remedial works and render facade repairs, by rope access with the building occupied.
Read the case study
Beachfront tower: pressure washing, painting of all external surfaces, balustrade resealing and concrete repairs, all by rope access.
Read the case studySend us the address and what you're seeing. We'll inspect, then come back with options and a price.