
Cammeray Square
CAMMERAY · 2020–2026Cladding replacement on Buildings B and D (fire order), facade works, a staged repaint of Building A, balcony and terrace upgrades and leak repairs.
Read the case study
Cladding replacement and facade upgrades, including fire-order works.
Get a quoteRemoval and replacement of failing or non-compliant cladding, including fire-order works, plus wider facade upgrades on buildings that stay occupied throughout.
In detail
How we access it
Our own IRATA/ARAA certified crew. Fast to set up, no footpath closures and minimal disruption for residents.
Elevated work platforms for low-rise elevations with clear ground access.
For heavy or full-height scopes. We arrange it and explain why it is worth the cost.
Related projects
Yes. We remove non-compliant cladding and install compliant replacement panels, including work under fire orders, with the flashings, sarking and sealing around them.
No. We work from ropes outside the building. On the day we are outside a unit, residents may be asked to keep windows closed and clear the balcony.
Yes. We can attend a committee meeting or site walk, answer owners' questions, and provide our licence, insurance certificates, safety documents, references and a capability statement with similar projects.
A clear scope of work, the access method, the materials and coating system, what's excluded, the program and staging, and the price. Where there are options, for example rope access versus scaffold, we show them side by side so the committee can compare like with like.
Yes. OneVision Project Services Australia Pty Ltd holds NSW contractor licence 295049C. We carry public liability and professional indemnity insurance up to $20 million, plus workers compensation, and send certificates of currency with every quote on request.
Send us the address and what you're seeing. We'll inspect, then come back with options and a price.